Services
GWS experience in environmental remediation, structural support and general construction prodided us the advantage of performing complete environmental work from tank removals to pollutant clean-up and, finally, complete restoration of the property.
Since the beginning, we have been fulfilling our clients’ contracting and environmental needs with our mission of 100% customer satisfaction
-
Engineers
-
Consultants
-
Licensed Site Remediation Professionals – commercial
-
NJDEP Subsurface Evaluator – Residential
Monitoring & Bedrock Wells
via Direct Push or Hollow Stem Auger
Injection Wells
For InSitu Remediation Projects
Well Abandonment
Decommissioned per DEP Requirements
Monitoring & Bedrock Wells
Monitoring Wells are used specifically for monitoring underlying water quality and they can be in place for as little as 1 month or years. The length of use of the monitors for water sampling based on the specific project.
Injection Wells
In-situ remediation refers to the clean up process of contaminated sites without removing the contaminate material. The goal of this type of remediation is reduce the need for extensive excavation & transportation of such contaminated materials.
Well Abandonment
Only licensed drilling providers are authorized to remove the wells. The “removal” process depends on the way the well was originally documented by the DEP and strict guidelines must be followed to appropriately decommission and abandon.